Certified Management System

Kyoto Protocol to the U.N.F.C.C.C. (1997)

Certificate Holder: Xinjiang Uygur Autonomous Region Kashgar Tarim River Xiabandi Hydropower Station

Test Mark Number: 9105053212

Certificate scope:
  • Kyoto Protocol to the U.N.F.C.C.C. (1997):
    The Xinjiang Uygur Autonomous Region Kashgar Tarim River Xiabandi Hydropower Station (hereafter referred to as ‘the proposed project’ or ‘the project activity’) is located in the middle reaches of Taxkorgan River, the first branch of Yerqiang River, in Tarim River Basin. It is constructed and operated by Kashgar Tarim River Hydro-electric Development Co., Ltd. The installed capacity of the project activity is 150MW and the surface area at full reservoir level with multi-year regulation is 21,000,000m2, therefore, the power density is 7.14W/m2. On the average, the project activity is expected to operate 3,096hours per year, which corresponds to an average annual generation of 464,400MWh and the net electricity supplied to the grid of 440,830MWh.
Description:
Description:

The Xinjiang Uygur Autonomous Region Kashgar Tarim River Xiabandi Hydropower Station (hereafter referred to as ‘the proposed project’ or ‘the project activity’) is located in the middle reaches of Taxkorgan River, the first branch of Yerqiang River, in Tarim River Basin. It is constructed and operated by Kashgar Tarim River Hydro-electric Development Co., Ltd. The installed capacity of the project activity is 150 MW and the surface area at full reservoir level with multi-year regulation is 21,000,000 m2, therefore, the power density is 7.14 W/m2. On the average, the project activity is expected to operate 3,096 hours per year, which corresponds to an average annual generation of 464,400 MWh and the net electricity supplied to the grid of 440,830 MWh.

Host Country: P.R. China
Download PDD: Project Design Document
Open for Public Comments: from 2009-05-16 to 2009-06-14 (closed)
Comments received: None
Further information by the certificate holder: The certificate holder has not provided further information.
Contact to the certificate holder: Xinjiang Uygur Autonomous Region Kashgar Tarim River Xiabandi Hydropower Station

Status Under validation
China

Downloads

Document Type Document Title Approved by TÜV Rheinland Document Description
Project Design Document "Xinjiang Uygur Autonomous Region Kashgar Tarin River Xiabandi Hydropower Station" No